How many 16×16 pavers for a 12×12 patio?

Short answer

A 12 × 12 ft patio (144 square feet) laid in large 16 × 16 in pavers needs 90 pavers: 81 to cover it, plus 10%. Each paver covers about 1.78 square feet, which is why the count is so low. Underneath go about 3.9 tons of crusher run for a 4 in compacted base running 4 in past the edges, and 13.2 cubic feet of bedding sand.

How to work it out

  1. 12 ft × 12 ft = 144 sq ft
  2. 144 sq ft ÷ (16 × 16 in = 1.778 sq ft) + 10% (not sure yet) = 90 pavers
  3. To order by area: 144 sq ft + 10% = 158 sq ft
  4. Base area (base runs 4 in past each edge): 12.7 × 12.7 ft = 160 sq ft
  5. 160 sq ft × 4 in = 1.98 cu yd compacted
  6. 1.98 cu yd compacted × 1.25 = 2.48 cu yd loose × 1.5 tons/cu yd = 3.71 tons
  7. + 5% waste = 3.9 tons
  8. Effective rate: ≈ 1.97 tons per cu yd compacted
  9. Bedding sand: 144 sq ft × 1 in + 10% for screeding = 13.2 cu ft, or 27 bags of 0.5 cu ft
  10. Bulk sand: 13.2 cu ft × 1.5 tons/cu yd (damp, typical) = 0.73 tons → order 1 ton
  11. Joint sand: 0.42 cu ft of joints 0.125 in wide, filled to 1/8 in below the top × 100 lb/cu ft = 1 bag (50 lb) (about 171 sq ft per bag)
  12. Dig: 4 in base + 1 in sand + 2.375 in paver = 7.38 in → about 7-1/2 in
  13. Soil out: 144 sq ft × 7.38 in under the pavers + 16.4 sq ft × 4 in base-only strip = 3.48 cu yd in the ground × 1.25 = 4.35 cu yd loose
  14. Edging: 48 ft around; 1 spike per foot = 48 spikes

These are big slabs, not bricks: a 16 × 16 in paver is 1.78 square feet on its own, so 12 × 12 ft takes under a hundred of them. With standard 12 × 12 in pavers the same patio needs 159, and with small 4 × 8 in brick pavers it is over 700 once you add extra for cuts.

Adjust for your project

ft
ft
in
Measure one paver, or read the label. Multi-size pattern kit? Use "Coverage per pallet" in More options.
in
Sets the extra for cuts. More cuts, more extra
On clay or wet ground ICPI calls for a deeper base and allows a geotextile under it
in
ICPI: at least 4 in on well-drained soil; 6–8 in on clay, wet ground or where it freezes. Driveways: 6 in or more.
sq ft
Printed on the pallet tag or the maker’s spec sheet. It varies by maker and paver size, so we don’t guess · blank to skip
More options: Extra · Sold · Price …
%
Blank = from the pattern above. Straight rows 5% · herringbone 10–15% · curves 15–20%
$
Blank to skip
in
Most patio pavers are 2⅜ in (2.375). For a driveway many makers suggest 3⅛ in (3.125); ICPI allows 2⅜ in on home driveways.
Crusher run (dense-graded base) is the usual choice. Your supplier’s weight per yard is better than ours
in
Blank = the base depth. ICPI: at least the base thickness past the edging spikes (10 in is plenty) so the edge doesn’t roll off
%
Extra loose gravel to reach the compacted depth. Blank = typical: crusher run 25%, #57 stone 5%, your own material 25%. Dense-graded base / DGA 20–30%, clean stone 5–10%
%
Low spots, spillage and edges · 5% is typical
in
About 1 in, screeded (ICPI). Not over 1½ in — thick sand shifts. We add 10% for screeding and spills.
in
Gap between pavers, for the polymeric sand. Pavers with spacer nubs: about 1/8 in (0.125)
No edge restraint needed there. Rectangle: we take off the length first, then the width
Pavers90 pavers
Pavers to order by area (sq ft, with extra)
158 sq ft
Patio area
144 sq ft
Base gravel (crusher run)
3.9 tons (7,799 lb)
Bedding sand
13.2 cu ft (0.49 cu yd)
Bedding sand in bags
27 bags (0.5 cu ft)
Bedding sand, bulk weight (approx.)
0.73 tons (1,467 lb)
Bedding sand, bulk order (rounded up to ½ ton)
1 ton
Polymeric joint sand
1 bag (50 lb)
Dig down about
7-1/2 in
Soil to remove (in the ground)
3.48 cu yd
Soil to haul away (loose, about +25%)
4.35 cu yd
Edge restraint
48 ft
Edging spikes
48 spikes
  • Slope the patio about ¼ in per foot (2%) away from the house — never less than about 3/16 in per foot (1.5%, ICPI’s minimum) — and dig the excavation to the same slope.
  • Bedding sand is screeded about 1 in thick and never used to fill low spots; ICPI keeps it under about 1½ in.
  • Dug soil fluffs up once it is out of the ground — typically 20–30%, more for clay — so the pile, trailer or dumpster needs room for the loose figure, not the in-ground one.

For this job · affiliate link
Paver edge restraintThe exposed edge is 48 ft. Without a restraint spiked into the base along it, the outside rows creep outward within a season or two.
View on Amazon (opens in a new tab)

Base gravel and dig depth for a 12 × 12 patio, by base depth

Base gravel and dig depth for a 12 × 12 patio, by base depth
Base depthBase gravel (crusher run)Dig down aboutSoil to remove (in the ground)
4 in3.9 tons7-1/2 in3.48 cu yd
5 in5 tons8-1/2 in4.04 cu yd
6 in6.16 tons9-1/2 in4.63 cu yd
8 in8.64 tons11-1/2 in5.89 cu yd

What to know about a 12×12 patio in 16×16 pavers

Twelve by twelve fits a dining table for six with room to pull the chairs out. The lucky part of this size is the arithmetic: 144 in divides evenly by 16 in, so a truly square patio lays out as a 9 × 9 grid of 81 slabs with no cuts at all. If your edges really are straight and square, pick running bond or stack in the pattern box: 5% extra (86 slabs) covers breakage. The 10% default assumes a few cuts.

  • The base is bigger than the patio. At 4 in deep the base runs 4 in past each edge, so you are building a 12⅔ ft square: 160 sq ft of crusher run, not 144. That and compaction are why the order is 3.9 tons rather than the 2.7 tons a plain 144 sq ft × 4 in estimate gives.
  • Weight per slab. A 16 × 16 in concrete paver weighs roughly 30–50 lb depending on its thickness, so you will be carrying them one at a time. Check the thickness on the label and put it in the calculator; it changes the dig depth.
  • Flatness matters more. Big slabs rock on any high spot and show every dip as a lip at the joint. Screed the sand carefully and don’t walk on it once it is screeded.
  • Little joint sand. Big slabs have few joints: one 50 lb bag of polymeric sand covers about 171 sq ft at 1/8 in joints, so one bag does the whole patio.
  • Metric twin. At 13.4 m² this is almost the same size as the metric How many pavers for a 3 × 4 m patio example, which uses 30 cm slabs instead.

For a smaller brick-paver version see How many pavers for a 10×10 patio.

What you’ll need

As an Amazon Associate we earn from qualifying purchases. Links to products are affiliate links — they cost you nothing extra and help keep these calculators free.

Frequently asked questions

How many 12×12 pavers for a 12×12 patio?

159 pavers: 144 square feet at one paver per square foot, plus 10%. The base and sand don’t change (3.9 tons of crusher run).

How many 16×16 pavers for a 12×12 patio laid in straight rows?

86 pavers with 5% extra. A square 12 × 12 ft patio is exactly 9 × 9 slabs, so with straight edges almost nothing needs cutting.

How much base for a 12×12 paver patio 6 inches deep?

About 6.16 tons of crusher run. The base becomes 13 × 13 ft (169 sq ft) because it runs 6 in past each edge, and the dig goes to about 9-1/2 in.